Application example:
Showrooms for shopping centre
Client
Shopping centre
Requirement
Rapid erection of five showrooms for rental use for several months.
Equipped with interior tarpaulins, sliding gates and connecting passages to the main building. The total assembly duration of the showrooms was 4 days.
Hall type
Aluflex temporary building with trapezoidal steel sheet wall cladding and high density fabric roof cladding
Equipment
- Aluminium frame construction
- Roof cladding of translucent, plastic-coated high density fabric
- Wall cladding of galvanised and colour-coated trapezoidal steel sheet
- Interior tarpaulin from eave to eave
- 2 single-leaf sliding gates
- 1 double-leaf sliding gate
- 50 rm tarpaulin - intermediate gutter