4th step: Your hall is assembled

The construction materials for your hall are delivered within a short time: For the uninsulated light weight hall and the storage marquee, this is within a few days, for the insulated light weight hall, within approx. 4 weeks, and for the steel hall, within a period of 6 to 8 weeks. The hall is erected by specialised contractors who are thoroughly familiar with our products and all assembly details, and with whom we have collaborated trustfally for decades.

Assembly of an uninsulated light weight hall or of an Aluflex storage marquee in 1 to 3 days.

For medium-sized construction projects assembly takes from 1 to 3 days. Naturally for light weight halls and storage marquees with a length of 100 meters, for example, for multi-bayed marquees, or for insulated light weight halls, assembly takes longer. After assembly the light weight halls and storage marquees are immediately ready for implementation.

Assembling a Steelflex steel building in 2 to 6 weeks

Assembly of a steel halls is more complex and takes more time - depending on hall size and selected equipment. Normally assembly of halls with a surface area of up to 1,000 m² takes 2-3 weeks, for larger halls it takes 4-6 weeks. Subsequently you receive instruction in the operation and control of gates, smoke and heat exhaust ventilation system, etc., if this has not already taken place when the respective lots were installed.

At HALTEC your construction project is in the best hands

We are specialists for light weight halls, storage marquees, and steel halls and know the requirements of the different industries. We take care of all concerns associated with our construction project so that you can devote yourself to your day-to-day business.